A few Bus Stop Descriptions (Names) have been updated in January 2026. Do head over to Settings and re-fetch your bus stop data to get the most up to date information.
The West Inner Loop of the Sengkang LRT Line will be closed from 19 April 2026 to 18 October 2026. This is to facilitate the track works needed to integrate the existing LRT line with the expanded Sengkang LRT Depot.
The East-West Line (EWL) will be closed between Tanah Merah–Expo from Saturday, 14 March 2026 to Tuesday, 17 March 2026. This is to disconnect the reception tracks linking the EWL with Changi Depot, following the operationalisation of the new East Coast Integrated Depot (ECID) in December 2025..
Reduced train services along the entire Circle Line (CCL) will take place from Saturday 17 January 2026 to Sunday 19 April 2026 to facilitate essential tunnel strengthening works between Mountbatten, Dakota and Paya Lebar stations.
PTC grants overall fare adjustment of 5.0% - below the maximum allowable quantum of 14.4%; deferment of remaining quantum (9.4%) supported by additional Government subsidies...