Opened

28 May 2009
(in Phases)

Length

35.7 km
(with 30 stations)

Operated By

smrt

Building the Circle Line (CCL) was a feat that required innovations in design, engineering and construction. It took place in challenging soil conditions, a maze of underground structures, and under a densely packed surface of roads, expressways and buildings.

Proposals for the line began in the 1990s, and plans for the CCL evolved to:

- cater to growing public transport demand,

- distribute commuter traffic away from busy interchanges, and

- create a greater number of connections and faster journeys.

As its name suggests, the 30-station CCL is a circular rail line linking the North-South, East-West and North East Lines to the city.

(Source: LTA )

CC 1 NS 24 NE 6
Dhoby Ghaut
CC 2
Bras Basah
CC 3
Esplanade
CC 4 DT 15
Promenade
CC 5
Nicoll Highway
CC 6
Stadium
CC 7
Mountbatten
CC 8
Dakota
CC 9 EW 8
Paya Lebar
CC 10 DT 26
MacPherson
CC 11
Tai Seng
CC 12
Bartley
CC 13 NE 12
Serangoon
CC 14
Lorong Chuan
CC 15 NS 17
Bishan
CC 16
Marymount
CC 17 TE 9
Caldecott
CC 19 DT 9
Queenstown
CC 20
Farrer Road
CC 21
Holland Village
CC 22 EW 21
Buona Vista
CC 23
one-north
CC 24
Kent Ridge
CC 25
Haw Par Villa
CC 26
Pasir Panjang
CC 27
Labrador Park
CC 28
Telok Blangah
CC 29 NE 1
HarbourFront